Braun NL Series Bedienungsanleitung Seite 48

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 53
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 47
Page 46
Maintenance and Lubrication Schedule
Perform all procedures listed in previous section also
Inspect handrail components for wear or damage,
and for proper operation
Inspect microswitches for securement and proper
adjustment.
Make sure lift operates smoothly
Inspect external snap rings:
• Handrail pivot pins (2 per pin)
• Platform slide/rotate pivot pins (2 per pin)
• Platform fold axles (1 per axle)
• Inner roll stop lever bracket pins
(1 per pin)
• Lift-Tite
latch gas (dampening) spring (2 per
spring)
Inspect platform fold axles and bearings for wear
or damage and positive securement
Replace defective parts.
Resecure, replace or adjust as needed. See
Microswitch Adjustment Instructions.
Realign towers and vertical arms. Lubricate or
correct as needed.
Resecure or replace if needed.
Replace defective parts and resecure as needed.
Apply Light Oil.
1500
Cycles
continued
Seitenansicht 47
1 2 ... 43 44 45 46 47 48 49 50 51 52 53

Kommentare zu diesen Handbüchern

Keine Kommentare