Braun NL Series Bedienungsanleitung Seite 50

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 53
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 49
Page 48
Maintenance and Lubrication Schedule
Perform all procedures listed in previous section also
Replace if needed.
Tighten or replace if needed.
Replace defective parts and resecure as needed.
Apply Light Grease during reassembly proce-
dures.
Replace if needed.
Tighten, replace or correct as needed
Apply Door-Ease or replace if needed. See Lubri-
cation Diagram.
Resecure or replace if needed.
Resecure, repair or replace if needed.
Inspect parallel arms, bushings and pivot pins for
visible wear or damage
Inspect parallel arm pivot pin mounting bolts (8)
Inspect platform pivot pin, bushings and vertical
arms for wear, damage and positive securement
Inspect upper/lower fold arms, rotating pivot slide
arms, slide support arms and associated pivot pins,
bushings, and bearings for visible wear or damage
Inspect gas springs (cylinders) for wear or damage,
proper operation and positive securement
Inspect rotating pivot slide arm UHMW slide bear-
ings (buttons)
Inspect vertical arm plastic covers
Inspect power cable
4500
Cycles
continued
Seitenansicht 49
1 2 ... 45 46 47 48 49 50 51 52 53

Kommentare zu diesen Handbüchern

Keine Kommentare